12V 24V charge and diacharge controller installation and precautions

(Summary description)Prepare 12V 24V charge and diacharge controller related tools and cables. It is recommended that you select a suitable cable to ensure that the current density is less than 4A/mm2, which is beneficial to reduce the line voltage drop. Recommendation: 16mm2 cable for 40A-60A.

12V 24V charge and diacharge controller installation and precautions

(Summary description)Prepare 12V 24V charge and diacharge controller related tools and cables. It is recommended that you select a suitable cable to ensure that the current density is less than 4A/mm2, which is beneficial to reduce the line voltage drop. Recommendation: 16mm2 cable for 40A-60A.

Information

1. Prepare 12V 24V charge and diacharge controller related tools and cables. It is recommended that you select a suitable cable to ensure that the current density is less than 4A/mm2, which is beneficial to reduce the line voltage drop. Recommendation: 16mm2 cable for 40A-60A.

12V 24V charge and diacharge controller

2. Check whether the installation site complies with the relevant safety regulations. Please avoid installing and using the 12V 24V charge and diacharge controller in a place with damp, dusty, flammable, explosive and corrosive gas.

3. Fix the 12V 24V charge and diacharge controller on the vertical plane.

4. To ensure good heat dissipation conditions for the 12V 24V charge and diacharge controller, please reserve 10cm space on the top and bottom of the controller.

5. Connect the load, battery, and solar panel to the controller in order, and ensure that the polarity of the load, battery, and solar panel is consistent with the controller.

6. Insert the external temperature sensor probe into the temperature probe interface on the left side of the controller, and place the probe at a place close to the temperature of the battery.

7. If there is a remote monitoring function, please insert one end of the attached communication cable into the communication port on the right side of the controller, and connect the other end to the upper computer.
Disassembly: To prevent accidents, please disconnect the solar panel, battery, and load from the 12V 24V charge and diacharge controller in order when disassembling.
Note: Reverse connection of battery polarity will not damage the 12V 24V charge and diacharge controller, but it will pose a safety risk to your load equipment.

Keyword:

Scan the QR code to read on your phone

About us   

Projects   

Messages      

Contact us   

Skype: ws.charger
Tel: +
86-755-28227280
Fax: +86-755-28227281
Email:
sales@huaxiaotech.com
Add:Qinghu Industrial Park,Qingxiang Road, 
Longhua District,Shenzhen,518129 CHINA

Copyright © 2015 Shenzhen HUAXIAO Technology Co.,Ltd. 

粤ICP备11104137号